Scoil Naoimh Pio – Soil Polishing Filters & Carpark
Value: €110,317,66
Client: Dept. of Education – Contact : Gary Barron 086 2240345
Click images above to view larger.
Brief Summary Works:
Above works was tendered on selective tendering procedures, advertised on e tenders, and was awarded on basis of price and technical merit. Was a 3 month contract for the above works carried out during period where school was still in term. Therefore, works needed to be carried out in a manner with least disruption to pupils and teachers, and careful consideration was required regarding access to the works areas, please refer to brief summary of scope below
Scope:
- Provide for design, supervision and certification of soil polishing filter in accordance with EPA publication “Code of Practice: Wastewater Treatment and Disposal Systems
- Existing pump house to be demolished and removed off site
- Construct soil polishing filter (minimum area of 640m2 required) to EPA COP
- Control Cabinet to WWTS
- Carriageway and Carpark area to be constructed
- Footpaths and Paved Areas
- New Ramps and Railing
- Fencing and Signage
- Landscaping Works